Division of Design and Construction
45 West Gude Drive
Suite 4300
Rockville, MD 20850
DDC@mcpsmd.org
240-740-7700
This project included the replacement of the structure built in 1971 and upgrades to the gymnasium, and classrooms spaces built in 2005. The new facility addresses the space and core deficiencies of the previous building and provides additional program and support spaces for the increasing student enrollment at South Lake Elementary School. Following the guidelines provided in MCPS Regulation FAA-RA, Educational Facilities Planning, the proposed new facility was designed for a capacity of 796 students.
The new building is organized around a central exterior courtyard with a compact plan that provides natural lighting and views for the school’s circulation and various programmatic spaces.
The classrooms have been designed to support interactive educational technology, including controlled, wireless computer access and interactive systems. The wireless technology throughout the building allows for computer system mobility and increased classroom utilization flexibility.
In addition to the 24 standard classrooms and support spaces, classrooms have been provided for pre-K (1), Head Start (1), kindergarten (3), Multidisciplinary Education, Training, and Support (METS) (1), music (1), instrumental (1), and dual purposes (1).
Occupants have high levels of control over individual lighting and thermal comfort, promoting an enhanced indoor environment.
Bike racks encourage students and staff to improve their physical and mental health while helping the environment.
Reports for the former facility: